Construction update photos: 7/25/08
Monday, July 28th, 2008 by Chad Croft
Photographs of underwater tower construction from July 25, 2008. These include an aerial view of the lowering of the bottom section and shots of the installation of the frames for the bottom control gates that control the water flow at the bottom of the tower.
View photos and descriptions
Comments may be made by following the link to the full post








